img
No Internet
SWIPE TO GO BACK
TRIP
POSITION
INFO
PORT CALLS
VISITED PORTS
LAST TRIPS
EVENTS
WEATHER
Upload Photo
Type
IMO ---
MMSI 338163602
Flag
Flag USA
Call Sign ---
Size 13 x 4 m
GT ---
DWT ---
Build ---
Status Active
Owner

Current Trip

Flag USIIC
ATD
2026-10-18 14:49 (UTC)
16 days ago

Unknown

Destination Port
ETA*
---
Time Travelled 16 days
Remaining Time ---
Distance Travelled 13.96 nm
Remaining Distance ---
AVG Speed 5.7 Knots
MAX Speed 8.9 Knots
AVG Wind 6.5 knots
MAX Wind 11.7 knots
MIN Temp 11°C / 51.8°F
MAX Temp 18°C / 64.4°F
Draught ---
Position Received 3 m ago

Current Position

Longitude ---
Latitude ---
Status Default
Speed
Course ---
Area North Atlantic Ocean
Station T-AIS
Position Received 3 m ago

Info

info

Information

The current position of CHANGE ORDER is in North Atlantic Ocean with coordinates 38.96264° / -76.48345° as reported on 2026-11-03 15:24 by AIS to our vessel tracker app. The vessel's current speed is 0 Knots

The vessel CHANGE ORDER (MMSI: 338163602) is a Pleasure Craft It's sailing under the flag of [US] USA.

In this page you can find informations about the vessels current position, last detected port calls, and current voyage information. If the vessels is not in coverage by AIS you will find the latest position.

The current position of CHANGE ORDER is detected by our AIS receivers and we are not responsible for the reliability of the data. The last position was recorded while the vessel was in Coverage by the Ais receivers of our vessel tracking app.

Weather

Temperature 16.4°C / 61.52°F
Wind Speed 5 knots
Direction 191° S
Pressure 1026.3 hPa
Humidity 62.7 %
Cloud Coverage 93 %

Featured Company

Last Port Calls

Port Arrival Departure Time In Port
Flag SAINT MICHAELS 2026-10-18 14:49
Show More

Most Visited Ports (Last year)

Port Arrivals
Flag SAINT MICHAELS 1
Flag BALTIMORE 1

Last Trips

Origin Departure Destination Arrival Distance

Events

Time Event Details Position / Dest Info
2026-11-02 10:16 IN Coverage
38.96263 / -76.48345
North Atlantic Ocean
Speed:
Course: 328°
2026-11-02 09:03 OUT of Coverage
38.96264 / -76.48345
North Atlantic Ocean
Speed:
Course: 328°
2026-11-01 13:48 IN Coverage
38.96265 / -76.48345
North Atlantic Ocean
Speed:
Course: 328°
2026-10-31 23:33 OUT of Coverage
38.96264 / -76.48345
North Atlantic Ocean
Speed:
Course: 328°
2026-10-31 23:01 IN Coverage
38.96265 / -76.48343
North Atlantic Ocean
Speed:
Course: 328°
2026-10-30 20:39 OUT of Coverage
38.96265 / -76.48346
North Atlantic Ocean
Speed:
Course: 328°
2026-10-30 20:39 IN Coverage
38.96265 / -76.48346
North Atlantic Ocean
Speed:
Course: 328°
2026-10-30 15:21 OUT of Coverage
38.96264 / -76.48345
North Atlantic Ocean
Speed:
Course: 328°
2026-10-30 14:57 IN Coverage
38.96262 / -76.48346
North Atlantic Ocean
Speed:
Course: 328°
2026-10-30 01:15 OUT of Coverage
38.96261 / -76.48344
North Atlantic Ocean
Speed: 0.1 kn
Course: 328°
Show More