CRITICAL PATH
Pleasure Craft
Current Trip
| Trip Time | 49 mins |
|---|---|
| Trip Distance | 2.78 nm |
| AVG Speed | 5 Knop |
| MAX Speed | 6.1 Knop |
| Djupgående | --- |
| AVG Wind | 5 knots |
| MAX Wind | 5 knots |
| MIN Temp | 23.1°C / 73.58°F |
| MAX Temp | 23.2°C / 73.76°F |
| Position mottagen | 16 m sen |
Current Position
| Longitud | --- |
|---|---|
| Latitude | --- |
| Status | Default |
| Fart | |
| Kurs | 88° |
| Område | North Atlantic Ocean |
| Station | T-AIS |
| Position mottagen | 16 m sen |
Info
Information
The current position of CRITICAL PATH is in North Atlantic Ocean with coordinates 26.10750° / -80.12458° as reported on 2026-01-05 08:03 by AIS to our vessel tracker app. The vessel's current speed is 0 Knop and is currently inside the port of FORT LAUDERDALE.
The vessel CRITICAL PATH (MMSI: 368437760) is a Pleasure Craft It's sailing under the flag of [US] USA.
In this page you can find informations about the vessels current position, last detected port calls, and current voyage information. If the vessels is not in coverage by AIS you will find the latest position.
The current position of CRITICAL PATH is detected by our AIS receivers and we are not responsible for the reliability of the data. The last position was recorded while the vessel was in Coverage by the Ais receivers of our vessel tracking app.
Weather
| Temperature | 23.5°C / 74.3°F |
|---|---|
| Wind Speed | 6 knots |
| Direction | 66° ENE |
| Pressure | 1016.8 hPa |
| Humidity | 68.1 % |
| Cloud Coverage | 4 % |
Featured Company
Last Port Calls
| Port | Arrival | Departure | Time In Port |
|---|---|---|---|
| 2025-12-27 19:56 | |||
| 2025-12-21 20:34 | 2025-12-27 19:07 | 5 d | |
| 2025-11-25 14:34 | 2025-12-21 18:38 | 26 d | |
| 2025-11-23 15:32 | 2025-11-25 07:45 | 1 d | |
| 2025-11-14 14:31 | 2025-11-21 09:07 | 6 d | |
| 2025-11-13 20:12 | 2025-11-14 06:43 | 10 h | |
| 2025-11-13 18:50 | 2025-11-13 20:02 | 1 h | |
| 2025-11-06 11:38 | 2025-11-13 18:36 | 7 d | |
| 2025-11-02 14:20 | 2025-11-06 10:06 | 3 d | |
| 2025-11-02 08:00 |
Most Visited Ports (Last year)
| Port | Arrivals | |
|---|---|---|
| 9 |
Last Trips
| Origin | Departure | Destination | Arrival | Distance | |
|---|---|---|---|---|---|
| 2025-12-27 19:07 | 2025-12-27 19:56 | 2.78 nm | |||
| 2025-12-21 18:38 | 2025-12-21 20:34 | 10.97 nm | |||
| 2025-11-25 07:45 | 2025-11-25 14:34 | 33.05 nm | |||
| 2025-11-21 09:07 | 2025-11-23 15:32 | 12.49 nm | |||
| 2025-11-14 06:43 | 2025-11-14 14:31 | 7.15 nm | |||
| 2025-11-13 20:02 | 2025-11-13 20:12 | 1.22 nm | |||
| 2025-11-13 18:36 | 2025-11-13 18:50 | 1.43 nm | |||
| 2025-11-06 10:06 | 2025-11-06 11:38 | 9.55 nm | |||
| 2025-11-02 08:00 | 2025-11-02 14:20 | 4.53 nm |
Events
| Tid | Event | Detaljer | Position / Dest | Information |
|---|---|---|---|---|
| 2026-01-05 05:36 | I täckningsområde |
26.10751 / -80.12460
North Atlantic Ocean
[US] FORT LAUDERDALE
|
Fart: Kurs: 87° |
|
| 2026-01-05 03:37 | UTANFÖR täckningsområde |
26.10752 / -80.12459
North Atlantic Ocean
[US] FORT LAUDERDALE
|
Fart: Kurs: 86° |
|
| 2026-01-05 02:06 | I täckningsområde |
26.10752 / -80.12452
North Atlantic Ocean
[US] FORT LAUDERDALE
|
Fart: Kurs: 87° |
|
| 2026-01-05 00:48 | UTANFÖR täckningsområde |
26.10753 / -80.12454
North Atlantic Ocean
[US] FORT LAUDERDALE
|
Fart: Kurs: 86° |
|
| 2026-01-05 00:27 | I täckningsområde |
26.10752 / -80.12459
North Atlantic Ocean
[US] FORT LAUDERDALE
|
Fart: Kurs: 87° |
|
| 2026-01-04 22:33 | UTANFÖR täckningsområde |
26.10751 / -80.12457
North Atlantic Ocean
[US] FORT LAUDERDALE
|
Fart: Kurs: 88° |
|
| 2026-01-04 22:33 | I täckningsområde |
26.10751 / -80.12457
North Atlantic Ocean
[US] FORT LAUDERDALE
|
Fart: Kurs: 88° |
|
| 2026-01-04 21:09 | UTANFÖR täckningsområde |
26.10750 / -80.12457
North Atlantic Ocean
[US] FORT LAUDERDALE
|
Fart: Kurs: 86° |
|
| 2026-01-04 20:31 | I täckningsområde |
26.10750 / -80.12457
North Atlantic Ocean
[US] FORT LAUDERDALE
|
Fart: Kurs: 87° |
|
| 2026-01-04 18:39 | UTANFÖR täckningsområde |
26.10752 / -80.12459
North Atlantic Ocean
[US] FORT LAUDERDALE
|
Fart: Kurs: 87° |