img
No Internet
SWIPE TO GO BACK
TRIP
POSITION
INFO
PORT CALLS
VISITED PORTS
LAST TRIPS
EVENTS
WEATHER
Upload Photo
Type
IMO ---
MMSI 338404472
Pavillon
Flag USA
Call Sign ---
taille 12 x 4 m
GT ---
DWT ---
Construit ---
Etat Active
Propriétaire

Current Trip

Flag USLAX
ATD
2024-10-19 15:05 (UTC)
55 days ago

Unknown

Destination Port
ETA*
---
Time Travelled 55 days
Remaining Time ---
Distance Travelled 29.33 nm
Remaining Distance ---
AVG Speed 27.5 Noeuds
MAX Speed 29.1 Noeuds
AVG Wind 3.5 knots
MAX Wind 7.2 knots
MIN Temp 19.2°C / 66.56°F
MAX Temp 23.3°C / 73.94°F
Tirant d eau ---
Position reçue 2024-10-19 22:15

Current Position

Longitude ---
Latitude ---
Etat Default
Vitesse 28.1 Noeuds
Parcours 64°
Zone North Pacific Ocean
Station T-AIS
Position reçue 2024-10-19 22:15

Info

info

Information

The current position of CHANGE ORDER is in North Pacific Ocean with coordinates 33.69325° / -118.21260° as reported on 2024-10-19 22:15 by AIS to our vessel tracker app. The vessel's current speed is 28.1 Noeuds

The vessel CHANGE ORDER (MMSI: 338404472) is a Pleasure Craft It's sailing under the flag of [US] USA.

In this page you can find informations about the vessels current position, last detected port calls, and current voyage information. If the vessels is not in coverage by AIS you will find the latest position.

The current position of CHANGE ORDER is detected by our AIS receivers and we are not responsible for the reliability of the data. The last position was recorded while the vessel was in Coverage by the Ais receivers of our vessel tracking app.

Weather

Temperature 23.3°C / 73.94°F
Wind Speed 7 knots
Direction 242° WSW
Pressure 1016 hPa
Humidity 28.4 %
Cloud Coverage 26 %

Featured Company

Last Port Calls

Port Arrival Departure Time In Port
Flag LOS ANGELES 2024-10-19 15:05
Show More

Most Visited Ports (Last year)

Port Arrivals
Flag LOS ANGELES 6

Last Trips

Origin Departure Destination Arrival Distance

Events

Heure Evenement Détails Position/ Destination Info
Show More